dc.description.abstractLinac4 is a normal conducting, 160 MeV H{u100000} ions accelerator that is being constructed within the scope of the LHC Injectors Upgrade project. Linac4 will be connected to the Proton Synchrotron Booster during the next long LHC shutdown and it will replace the current 50 MeV proton linac, Linac2. Linac4 is being commissioned progressively with the installation of the accelerating structures into the Linac4 tunnel. Movable diagnostic benches, with various instruments, are used at each step to allow the detailed characterization of operational parameters that will play a key role in the overall future performance. The rst three stages of the commissioning, up to 12 MeV beam energy, were completed by the end of 2014 with a temporary version of the ion source. Using the permanent diagnostic instruments and a movable diagnostic bench, the Low Energy Beam Transport (LEBT) at 45 keV, the Radio Frequency Quadrupole (RFQ) and Medium Energy Beam Transport (MEBT) at 3 MeV, as well as the rst tank of the Drift Tube Linac (DTL) at 12 MeV were fully characterized.
dc.format.extent30 cm.
dc.format.pagesxxiv, 140 leaves ;
dc.identifier.otherPHYS 2015 Y45 PhD
dc.identifier.urihttps://digitalarchive.library.bogazici.edu.tr/handle/123456789/13770
dc.publisherThesis (Ph.D.)-Bogazici University. Institute for Graduate Studies in Science and Engineering, 2015.
dc.subject.lcshParticle accelerators.
dc.titleCERN LINAC4 beam dynamics studies and commissioning up to 12 MeV