An enumeration method for project scheduling

dc.contributorGraduate Program in Management.
dc.contributor.advisorTuğcu, Seyhan.
dc.contributor.authorAlpat, Fahrettin Tuğhan Uludağ.
dc.date.accessioned2023-03-16T12:13:49Z
dc.date.available2023-03-16T12:13:49Z
dc.date.issued1985.
dc.description.abstractThis thesis considers a scheduling problem that has precedence constraints of a general form as in CPM/Pert problems. It consists of two stages: First, the schedule of activities which minimizes total resource usage (optimum schedule) is generated. For this purpose, an exhaustive enumeration procedure is developed. Second, for this schedule, optimum resource requirements and overtime schedule that minimizes the total of regular and overtime work along with hiring and firing costs are determined. To accomplish this, another exhaustive enumeration technique is used to find the set of jobs that uses overtime. Following are obtained: * Total resources used (with and without overtime) for each unit of time in the project, * Set of activities using overtime, * Total cost in case of regular work, * Minimum cost in case of overtime work.
dc.format.extent30 cm.
dc.format.pagesviii, 66 leaves;
dc.identifier.otherAD 1985 Al7
dc.identifier.urihttps://digitalarchive.library.bogazici.edu.tr/handle/123456789/16787
dc.publisherThesis (M.A.) - Bogazici University. Institute for Graduate Studies in Social Sciences, 1985.
dc.subject.lcshProduction scheduling.
dc.subject.lcshNetwork analysis (Planning)
dc.subject.lcshPERT (Network analysis)
dc.titleAn enumeration method for project scheduling